The Dogger Bank Wind Farm project phases A, B and C need reliable high-voltage power links.
The offshore wind farm phases are being developed as a joint venture by Equinor, SSE Renewables and ENI Plenitude. The project is seen as a centerpiece of UK´s ambitious goal to reach 40 GW of installed offshore wind capacity and have UK households powered by offshore wind by 2030. The large offshore wind farm, created at a distance far from shore, will deliver power for millions of homes.
At NKT, we are pleased and proud to be selected as main contractor for the delivery and installation of the high-voltage DC onshore and offshore export cable systems. Equinor and SSE Renewables are our long-term customers and they recognize us as a professional partner in the industry. We gladly support them with our expertise and contribute to an increasing use of renewable energy sources in Europe.
As turnkey supplier of the cable systems, we are responsible for cable designs, accessory designs, engineering, manufacturing, laying and installation of the cables. Also the landfall cable including HDD (horizontal directional drilling) and the jointing to the onshore cables are included in the scope.